Oropharyngeal Airway plastic injection mold/mould

Specifications:

Specifications

1. Mould base: P20H LKM
2. Cavity Material: S136 , NAK80 ,SKD61 etc
3. Core Material: S136 , NAK80, SKD61 etc
4. Runner: Cold or Hot
5. Mould Life: ≧3millons or ≧1 millons moulds
6. Products Material: PVC, PP, PE, ABS, PC, PA, POM etc.
7. Design Software: UG. PROE
8. Over 20years Professional Experiences in Medical Fields.
9. High Quality
10. Short Cycle
11. Competitive Cost
12. Good After-sales service


Product Detail

Product Tags

Product Show

Guedel_Type
Guedel_Type2

Product Introduction

The oropharyngeal airway refers to the airway from the mouth to the pharynx. During breathing, air passes from the mouth into the pharynx and then further through the throat and trachea into the lungs. The oropharyngeal airway is part of the respiratory system and plays an important role in introducing air into the lungs. However, there are situations where the oropharyngeal airway may be affected by a number of problems and obstructions. For example, a throat infection or tumor may cause the throat to become narrow, making it difficult to breathe easily. In addition, enlargement of the back wall of the throat, tonsils, or base of the tongue may block the oropharyngeal airway. Obstruction of the oropharyngeal airway may cause problems such as difficulty breathing, difficulty speaking, snoring, or brief respiratory cessation during sleep. Patients with persistent airway obstruction may require diagnosis and treatment, such as snoring monitoring, airway imaging, or surgical intervention to restore a patent oropharyngeal airway. If you have a health problem related to your oropharyngeal airway, please consult a doctor or medical professional for accurate diagnosis and treatment recommendations.

Mould  Process

1.R&D We receive  customer 3D   drawing or sample with details requirements 
2.Negotiation Confirm   with clients details about: the cavity, runner, quality, price,   material, delivery time, payment item, etc. 
3.Place an order  According your clients design   or chooses our suggestion design. 
4. Mould First   We send mould design to customer approval before We make the mould and then start   production. 
5. Sample  If   the first sample come out is not satisfied customer, we modify the mould and   until meet customers satisfactory. 
6. Delivery time 35~45days

 

Equipment List

Machine  Name Quantity ( pcs ) The original country
CNC      5 Japan/Taiwan
EDM      6 Japan/China
EDM ( Mirror)      2 Japan
Wire Cutting  ( fast )      8 China
Wire Cutting  ( Middle )      1 China
Wire  Cutting  ( slow )      3 Japan
Grinding      5 China
Drilling      10 China
Lather     3 China
Milling     2 China

  • Previous:
  • Next: